Construction and storage of epoxy resin anti-corrosion steel pipe
(1) The dust, oil, oxide scale, etc. on the surface of the object must be cleaned before painting. Reach Sa 2.5 to guarantee the quality of the painting. It is strictly forbidden to bring water into the construction.
(2) The construction proportioning method is as follows: open the mouth of component A, add component B into component A, and stir well. After curing for 30 minutes, it can be painted.Copyright © 2017-2021 Threeway Steel CO., LTD. All rights reserved. Sitemap
Other friends: Threewaysteel, Threeway-pipe