Welcome to http://www.srtsteelpipe.com
   
Threeway Steel-Seamless Steel Pipe, ERW Steel Pipe, LSAW Steel Pipe, SSAW Steel Pipe
Contact Us
Seamless Steel Pipe,ERW Steel Pipe,LSAW Steel Pipe,SSAW Steel Pipe,

Threeway Steel Co., Ltd

E-mail: sales@srtsteelpipe.com

Address: 22nd Floor, Royal Wing Tower, Long Champ International Building, No.9 Xiangfu Road, Changsha, Hunan, China, PC: 410116

Phone:0086-731-8873-9521  

Home - NewsNews Center
Oil and Gas Drilling Collapse Deepens in July

Oil and Gas Drilling Collapse Deepens in July

Keywords :Oil and Gas Drilling Collapse Deepens in July        Update : 2020-08-18        View(s) : 945

The number of rigs drilling for oil and gas set a fresh record low in July, as activity continues to collapse outside of North America.   The Baker Hughes worldwide rig count dropped by 43 to 1,030 in monthly data, with regions beyond the U.S. and Canada accounting for almos...

BP will reduce fossil product output and invest heavily in low-carbon development

BP will reduce fossil product output and invest heavily in low-carbon development

Keywords :BP will reduce fossil product output and invest heavily in low-carbon development        Update : 2020-08-10        View(s) : 1038

According to foreign media reports, British Petroleum (BP) said that by 2030, it will increase its low-carbon funding by US$5 billion annually to increase its renewable energy power generation capacity to 50,000 megawatts, while increasing its oil and natural gas production. A 40% reduction in 2...

Oil Prices Get Boost

Oil Prices Get Boost from Stronger US Equities

Keywords :Oil Prices Get Boost        Update : 2020-07-31        View(s) : 1023

Oil edged up with support from U.S. equities, but pandemic-driven demand concerns capped the price rebound.   Crude futures of New York managed to close 0.5% higher on Monday, boosted by a stronger equity market. Still, the coronavirus is raging about the globe -...

steel pipes fittings

How to install stainless steel pipes fittings

Keywords :steel pipes fittings        Update : 2020-07-30        View(s) : 1004

1. The arc starting of stainless steel pipe fittings adopts the re-welding method, and the arc closing adopts the method of full arc craters. The arc starting should be completed in the slope, and the arcing and starting of the arc on the surface of the pipe and the pipe fitting bus bars shoul...

Piping and Component Materials

Inspection of Piping and Component Materials

Keywords :Piping and Component Materials        Update : 2020-07-29        View(s) : 1034

Piping and Component Materials 1. Material purchased is from the client approved manufacturer or vendor 2. Material specification, grade, thickness, size. 3. Any mechanical damages. 4. Heat numbers provided before the materials are matching w...

Page(s):  1 ... 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 ... 459