
Threeway Steel Co., Ltd
E-mail: sales@srtsteelpipe.com
Address: 22nd Floor, Royal Wing Tower, Long Champ International Building, No.9 Xiangfu Road, Changsha, Hunan, China, PC: 410116Phone:0086-731-8873-9521

Keywords :API 5L/ASTM A106 GR.B, LSAW Carbon Steel Pipe Update : 2020-11-20 View(s) : 1522
公称通径 DN 外径 OD(mm) SCHSTD (6m/12m) SCHXS(6m/12m) 壁厚 WT FOB 壁厚 WT FOB (mm) USD/TON ...

Keywords :API 5L/ASTM A106 GR.B, ERW Carbon Steel Pipe Update : 2020-11-20 View(s) : 1605
公称通径 DN 外径 OD(mm) SCH40(6m/5.8m) SCH80(6m/5.8m) SCH160(6m/5.8m) 壁厚 WT FOB 壁厚 WT FOB 壁厚 WT ...

Keywords :Global crude steel production in September increased by 2.9% year-on-year Update : 2020-11-20 View(s) : 1616
On October 23, the World Steel Association (WSA) released September's global crude steel production data. In September, the crude steel output of 64 countries and regions included in the World Steel Association's statistics was 156.4 million tons, a year-on-year increase of 2.9%. In Sept...

Keywords :Precautions for the use of directly buried insulation pipe Update : 2020-11-19 View(s) : 1707
1. The on-site joint insulation of direct-buried thermal insulation pipes can only be carried out after the pressure test is qualified. On-site joint thermal insulation construction is the specific construction quality of direct-buried thermal insulation pipes that directly affects the service l...

Keywords :Storage of seamless steel pipes Update : 2020-11-18 View(s) : 1625
1) The storage site or warehouse of steel should be in a clean place with unobstructed drainage, far away from factories and mines that produce harmful gases or dust. Weeds and all debris should be removed on the field, and the steel should be kept clean; 2) Do not stack w...