Welcome to http://www.srtsteelpipe.com
   
What are the details of the thick-walled steel pipe before use
Contact Us
thick-walled steel pipe

Threeway Steel Co., Ltd

E-mail: sales@srtsteelpipe.com

Address: 22nd Floor, Royal Wing Tower, Long Champ International Building, No.9 Xiangfu Road, Changsha, Hunan, China, PC: 410116

Phone:0086-731-8873-9521  

Home - News > Company NewsCompany News

What are the details of the thick-walled steel pipe before use

Update:2020-08-31   View(s):996   Keywords :thick-walled steel pipe

1. Thick-walled steel pipe cutting: According to the actual required pipeline length, the pipe should be cut with a metal saw or a toothless saw. When water welding is used in the cutting process, the raw materials should be protected accordingly. When cutting, fire-resistant and heat-resistant materials should be used as baffles at the two ends of the fracture to catch the sparks and hot molten iron that fall during cutting to protect the raw materials. The original plastic layer.

 

2. Thick-walled steel pipe connection: After the plastic repair is completed, connect the pipe and pipe fittings and install rubber pads between the flanges during the connection process, and tighten the bolts to the sealed state.

 

3. Thick-walled steel pipe plastic coating treatment: After polishing, use oxygen and C2H2 to heat the pipe mouth outside the pipe until the internal plastic layer is melted, and then the skilled worker will evenly apply the prepared plastic powder to the pipe mouth, Should pay attention to correspondingly to be smeared in place, and the flange plate should be smeared above the water stop line. In this process, the heating temperature should be strictly controlled. If the temperature is too high, bubbles will be generated during the plastic coating process. If the temperature is too low, The plastic powder will not melt during the plastic coating process. The above conditions will produce plastic after the pipeline is put into use. With the phenomenon of layer shedding, the thick-walled steel pipe part of the pipeline was corroded and damaged in the later stage.

 

4. Thick-walled steel pipe mouth grinding: After cutting, an angle grinder should be used to grind the plastic layer of the pipe mouth. The purpose is to avoid melting or burning the plastic layer during flange welding and destroying the pipe. Use an angle grinder to polish the plastic layer of the nozzle.

Related Information